This ongoing contract involves significant civil works for the upgrading of the Kabale-Lake Bunyonyi and Kisoro-Mgahinga roads, totaling 33.2 kilometers. The project aims to enhance road infrastructure by converting existing gravel roads to a paved (bituminous) standard.

Key Components of the Works Include:

  1. Drainage: Implementation of effective drainage solutions to prevent water accumulation and damage to the road surface.
  2. Earthwork & Pavement Layers: Preparation of the subgrade, including excavation, grading, and the installation of gravel or crushed stone layers.
  3. Bituminous Layers and Seals: Application of bituminous materials to provide a durable and smooth road surface.
  4. Ancillary Road Works: Additional works that support the main road construction, such as signage and road markings.
  5. Structures: Construction of necessary road structures, potentially including culverts and bridges.
  6. Tolerance, Testing, and Quality Control: Ensuring that all works meet specified tolerances and standards through rigorous testing and quality assurance measures.

Project Information

  • Client:
    Uganda National Roads Authority
  • Project Status:
    On Going
  • Start Date:
    September 2024
  • End Date:
    On-going
  • Category:
    Construction
  • UGX 112,038,539,400
    Budget: