This comprehensive project aimed to enhance the water supply and sanitation infrastructure in Pajule Town. Key works included:
- Construction of two pump stations with associated pump houses, a guard house, an Ecosan toilet, and two production wells, complete with fencing around the water sources.
- Building a water office block with a waterborne toilet, six household Ecosan toilets, and two institutional line VIP pit latrines.
- Development of four water kiosks for community access.
- Implementation of 600 private yard connections to improve individual access to water.
- Installation of a 1.1 km transmission pipeline and a 25 km distribution pipeline.
- Supply and installation of electromechanical works, including a three-phase power extension.
- Construction of a 200 m³ pressed steel cold-water reservoir tank elevated on a 12 m high tower.
- Conducting chlorination and sterilization of the water supply.
- Construction of a 1.2 km unpaved access road for improved transportation and logistics.