This project focused on enhancing water supply and sanitation in Kikagati Town, comprising:
- Trenching and Pipe Laying – Preparing the site for effective water distribution.
- Construction of Pump/Generator House – Building infrastructure for water pumping operations, including landscaping and fencing.
- Installation of 6.69 km Transmission Mains – Implementing a water supply system throughout Kikagati Town.
- Installation of Two Submersible Pumps – Ensuring efficient water extraction from sources.
- Private Connections and Yard Taps – Providing access points for residents.
- Construction of 160 m³ Reservoir and Collection Tank – Storing water for distribution.
- Pressure Testing, Electrical and Mechanical Works – Ensuring system reliability and functionality.
- Supply of Tools, Chlorination, and Sterilisation – Completing necessary sanitation procedures.