Awesome Image

This comprehensive project aimed to enhance the water supply and sanitation infrastructure in Pajule Town. Key works included:

  • Construction of two pump stations with associated pump houses, a guard house, an Ecosan toilet, and two production wells, complete with fencing around the water sources.
  • Building a water office block with a waterborne toilet, six household Ecosan toilets, and two institutional line VIP pit latrines.
  • Development of four water kiosks for community access.
  • Implementation of 600 private yard connections to improve individual access to water.
  • Installation of a 1.1 km transmission pipeline and a 25 km distribution pipeline.
  • Supply and installation of electromechanical works, including a three-phase power extension.
  • Construction of a 200 m³ pressed steel cold-water reservoir tank elevated on a 12 m high tower.
  • Conducting chlorination and sterilization of the water supply.
  • Construction of a 1.2 km unpaved access road for improved transportation and logistics.

Project Information

  • Client:
    Ministry of Water and Environment, Water and Sanitation Development Facility – North
  • Category:
    Completed
  • Start Date:
    November 2014
  • End Date:
    November 2015
  • Category:
    Construction
  • UGX 3,544,952,743
    Budget: